SAP PP (Production Planning) Basic to Advance Live Course

$90.12
$630.98
Description
Here is the Complete Syllabus of SAP PP (Production Planning) Basic to Advance Live Course - LIVE Batch will Start from 12 Dec 2025 at 7:00pm to 8:00pm
About Trainer Profile & Experience - Ms. Komal Yadav is a seasoned Functional Consultant with over 8 years of rich industry experience, having worked with top-tier multinational corporations. She holds deep expertise in SAP FICO (S/4 HANA) PP (Production Planning) & Materials Management (MM) modules, delivering practical business solutions across diverse sectors. A passionate trainer and mentor, Ms. Yadav has successfully trained 5,000+ students, freelancers, and working professionals, empowering them with real-time SAP skills and industry-relevant insights.
(Theoretical + Practical + Real-Time Industry Workflow)
1. SAP PP Foundation
- ERP & SAP Overview
- SAP Navigation & Core Modules (FI, CO, MM, SD, PP, QM, PM, HR)
- Introduction to Production Planning
- Manufacturing Types: Discrete / Process / REM
- Real-Time PP Process Flow
- Intermodule Integration (MM, SD, FI/CO, QM, PM)
2. Enterprise Structure Configuration
- Client → Company Code → Plant → Storage Location
- Work Center & Production Scheduling Profile
- Key Configurations:
- Assign Plant, Storage Location, Purchasing Org
- Create Production Scheduling Profile
- Important TCodes: OX10, OX09, OX14, OPPQ
3. Master Data (Backbone of PP)
Material Master
- MRP Views, Lot Size, Procurement Type
- BOM Explosion Controls
- TCodes: MM01, MM02, MM03
Bill of Materials (BOM)
- Single/Multi-Level, Alternative BOM
- Usage, Status, Reports
- TCodes: CS01, CS02, CS03, CS11
Work Center
- Capacity, Scheduling, Cost Center Integration
- TCodes: CR01, CR02, CR03
Routing
- Operation Sequence, Standard Times, Inspection
- TCodes: CA01, CA02, CA03
Production Version
- Integration of BOM + Routing
- TCode: C223
4. Demand Management
- Planning Strategies (MTS 10/40, MTO 20, ATO)
- Planned Independent Requirements (PIR)
- TCodes: MD61, MD62, MD63, MD04
5. Material Requirement Planning (MRP)
- MRP Types, Procedures, Control Parameters
- Lot Size: Fixed, LFL, Min/Max
- MRP Run & Result Analysis
- TCodes: MD01, MD02, MD03, MD04, MD05
6. Production Order Cycle
- Planned → Production Order Conversion
- Order Types, Status Flow (CRTD → REL → PCNF → CNF → TECO → CLSD)
- Full Cycle:
- Order Creation
- Availability Check
- Scheduling
- Release
- Material Issue
- Production Confirmation
- Goods Receipt
- Settlement & Closure
- Key TCodes: CO40, CO01, CO02, CO03, CO15, CO11N, MIGO, MB1A, MB31
7. Repetitive Manufacturing (REM)
- Product Cost Collector
- Backflushing
- REM Reporting
- TCodes: MF50, MFBF, MF47
8. Capacity Planning
- Work Center Capacity, Shifts, Overload Analysis
- Capacity Leveling
- TCodes: CR11, CM01, CM21
9. Module Integration
- MM: Raw Material Procurement
- SD: Sales Order → Production
- FI/CO: Costing & Settlement
- QM: In-Process & Final Inspection
- PM: Breakdown & Preventive Maintenance linkage
10. Reporting & Analytics
- Production Order Information System
- Stock Overview
- Work Center Load
- Cost Analysis
- TCodes: COOIS, MMBE, KKBC_ORD, MF47
11. Real-Time Case Studies
- End-to-End Business Cycle (Material → BOM → Routing → PIR → MRP → Order → Confirmation → GR → Settlement)
- Common Production Issues & Error Handling
- Practical Scenarios: MTO / MTS / REM
12. Interview & Job Preparation
- Top Interview Questions
- Project Flow Explanation
- PP Consultant Roles & Responsibilities
- Integration Testing (MM–PP–SD)
- Real Error-Solving Techniques
Duration & Deliverables
- Total Duration: 40–45 Hours
- Practice: 2 Hours/Day Recommended
- Deliverables:
- Configuration Notes
- End-to-End Project
- PPTs, Assignments
- Outcome: Become capable of handling complete SAP PP configuration, implementation & support in real industry scenarios.
Loading...